Installation
INSTALLATION:
- Connect water source to the inletĀ of the deionizerĀ (if you have the Dual/Tri Bed DI's connect the units together with the cam lever coupler)
- Make sure deionizer is standing upright for use
- Flush out system for 2-3 minutes (This gets out all the resin dust. It might need to be flushed out longer depending on unit size and flow rate. Check the TDS before use.)
- Connect outlet to point of use
- Your new unit is ready for use